Heeringa Electrical Service handles residential and commercial electrical work, including electrical panels and generators, for Rockford, MI and nearby communities.
Backup power and your electrical panel go hand in hand. Here are a few things worth thinking about before you call.
Which circuits matter most during an outage: fridge, sump pump, furnace, well pump?
Whether your current panel has room for what you're planning.
How a generator should connect safely to your home. Backfeeding through an outlet is dangerous.
Residential or commercial, call to talk through your property.
Power tools
Run the numbers first.
Two quick planning calculators. They're ballpark estimates to help you ask better questions, not a load calculation, design, or quote.
Tool 01
Backup generator sizer
Pick what you'd want running during an outage. Typical wattages, so check your own nameplates.
How it works
Running total = sum of selected running watts + other watts. Peak = running total + the single largest extra starting surge (start − run), since motors rarely start at the same moment. Suggested minimum = peak × (1 + margin). Typical values vary widely by model; use nameplate data. Not a substitute for a professional load evaluation or a safe transfer switch/interlock installation.
Add up what's on one circuit and compare it with the breaker and the 80% continuous-load guideline.
How it works
Amps = watts ÷ volts. For loads that run three hours or more, a common guideline keeps the load at or below 80% of the breaker rating (e.g. 16 A on a 20 A breaker). Motor and heating loads, wire size, and other devices on the circuit all matter. Breakers that trip repeatedly should be looked at by an electrician. Never upsize a breaker to stop trips.